|
|
|
Isolation/Vocal Room A (back) and the Control Room (front) Ready for Paint! With the exception of one small area above where the control room window will go, all the drywall for the control room and main vocal isolation room is finally installed. Some of these walls have as many as 5 layers on both sides of the studs! The others have a minimum of two. Whew! That was a lot of work! |