|
|
|
Isolation/Vocal Room A (back) and the Control Room (front) Here's yet another shot of Iso/Vocal Room A and the Control Room. The wall with the insulation showing is the very first wall that was built. The other side of that wall has been finished for a long time now. Finishing the insulation and the drywall on THIS side of the wall is a milestone! |